5 What are the requirements for dismantling the shuttering plywood of post-tensioned prestressed concrete structure?

For shuttering plywood price post-tensioned prestressed concrete members, the side modules should be dismantled before prestressing tensioning; the dismantling of shuttering plywood 12mm brackets should be carried out in accordance…

Continue Reading5 What are the requirements for dismantling the shuttering plywood of post-tensioned prestressed concrete structure?

What are the requirements for the arching of cast-in-place concrete beams and slabs when shuttering plywood 18mm building formwork is supported?

A: The specification stipulates that for cast-in-place concrete beams and slabs with a span of not less than 4m, the film faced shuttering plywood should be arched according to the…

Continue ReadingWhat are the requirements for the arching of cast-in-place concrete beams and slabs when shuttering plywood 18mm building formwork is supported?