Choose foundation formwork plywood from the faces actually being formed: beam sides, footing edges, soffits, steps and stop ends. A ground beam cast against prepared ground needs a different panel schedule from a suspended ground beam with a formed soffit.
PanelSource supplies film faced shuttering plywood as full sheets, beam-side blanks and custom-size plywood parts. Share a foundation sketch or the parts you need; we help develop the plywood supply around your project drawings.
A ground beam cast against prepared ground has a different plywood requirement from a suspended ground beam with a formed soffit. We explain how to define the panel scope, coordinate the trench interfaces and prepare a useful plywood enquiry without treating a sheet thickness as a complete formwork design.
Choose the plywood supply for your next step
- For repeated sides cut by your workshop, start with full sheets of film faced shuttering plywood.
- For beam strips, stepped sides and stop ends, choose custom-size plywood parts with clearly identified working faces and protected machined edges.
- For a specified black 18mm panel, compare 18mm black film faced plywood with the panel requirements established by the formwork design.
Mark the formed faces before counting plywood
On the foundation plan, distinguish beam sides, footing edges, formed bottoms, steps and temporary stop ends. Record where the design permits concrete against ground or blinding, and where a removable or permanent form is required. Do not assume that the full external surface area of every foundation needs plywood.
A beam crossing disturbed ground or a void may need a different bottom detail from an adjacent run. Similarly, an edge beside an existing structure may be inaccessible from one side. Identify those conditions separately instead of copying one typical section throughout the take-off.
Mark which faces will remain visible, receive waterproofing or be concealed by backfill. Appearance requirements may differ, but a concealed location does not remove the need for the specified dimensions, cover and sound concrete. Agree the finish that the next trade needs before choosing the facing.
Separate concrete dimensions from panel dimensions
Use one stated datum for the beam top, soffit, footing top and changes in level. Show where a step begins and ends in both plan and section. An overall beam depth is not enough to establish a side-panel cutting height if its lower edge sits on a rebate or overlaps another form.
Dimension the required concrete face first. Then show the plywood thickness, corner overlap, support position and any allowance required by the assembly detail. The outside width of a timber-framed form is not the finished concrete width.
| Drawing item | Why it affects the plywood |
|---|---|
| Concrete section and level change | Defines side heights, step faces and separate part sizes |
| Corner or intersecting beam | Determines which face continues and which part closes against it |
| Formed soffit or prepared base | Changes the panel scope and lower-edge interface |
| Stop end and next pour | Requires a separate closure detail around reinforcement and joint components |
| Waterproofing or visible edge | Establishes the surface and repair requirements after removal |
Issue a revised part drawing when a concrete dimension changes. Trimming an old panel to fit by eye can transfer the error to the next beam intersection.
Coordinate excavation support and formwork support separately
The excavation and the concrete form have different purposes. Trench support retains the surrounding ground; formwork contains the fresh concrete. A plywood side face cannot simply be treated as trench support, and a brace should not bear against an unassessed excavation wall.
HSE's excavation guidance addresses ground support, nearby loads, water and access. These conditions need consideration before selecting storage positions or assuming the edge of an excavation is a suitable working or bearing area.
Give the responsible temporary-works designer the actual available space, adjacent foundations, services and proposed restraint locations. A constrained side may change the formwork arrangement rather than merely require a narrower plywood piece.
Coordinate installation and removal access as well. A panel that fits into an open trench may be trapped once reinforcement, a cross beam or a later pour closes the route. Resolve that sequence before cutting a large continuous side.
Describe the base and restraint conditions accurately
Record whether the form stands on blinding, a structural slab, prepared ground or a separate support. Include changes in level and any concern about water, disturbance or settlement. These are design inputs; increasing plywood thickness alone does not correct an unsuitable bearing or restraint arrangement.
HSE's temporary-works guidance emphasises coordinated design, erection and checking. Use the project arrangement for braces, ties, fixings and supports rather than importing a universal spacing from a general article.
A foundation detail may also contain waterproofing, insulation or a ground-heave void former. Identify which components remain in place and which can accept construction loads under their specified design. Do not substitute ordinary plywood for a proprietary void-forming component simply because both occupy the same space.
Keep the lower-edge seal distinct from the supporting detail. Closing a gap against uneven blinding may control paste leakage, but the sealing material does not establish the form's resistance to concrete pressure.

Detail corners, stop ends and newly cut edges
Assign part IDs to repeated side panels and separate IDs to returns, closures and stepped pieces. Show the concrete-contact face and orientation. Repeated dimensions do not make left- and right-hand corner pieces interchangeable when their overlaps or holes differ.
Dimension penetrations and reinforcement slots from a named edge or centreline. A stop end crossing reinforcement needs an agreed assembly and removal detail; it should not become a collection of oversized site-cut holes filled without a defined method.
Keep cut edges and drilled openings in the finishing scope. APA's concrete-forming guidance connects panel care with protecting edges and surfaces and inspecting panels between uses. The appropriate treatment still needs to match the actual facing and supplier's instructions.
Where a part will be machined at site, identify who completes that treatment before installation. A factory-sealed full sheet no longer has protected edges everywhere after it has been cut into beam strips.
Leave room to check embedded items and remove debris
Coordinate starter bars, ducts, sleeves, earthing components and waterstops before the final side closes. Show their positions relative to the concrete face and reinforcement. Do not relocate them to suit a convenient panel seam without the relevant design decision.
Plan how sawdust, loose soil, wire ends and other debris will be removed from the bottom. A narrow, deep beam can become difficult to clean once both sides and reinforcement are complete. Use a cleanout arrangement defined in the construction method, with its closure checked before the pour.
Photograph concealed interfaces with a location label while they are accessible. The record should show what was checked, not just an unidentifiable close-up of a clean panel. Keep the inspection linked to the current drawing and pour area.
Plan panel recovery from below-ground work
Confirm the permitted removal sequence and access before the pour. Do not use a generic elapsed time as proof that foundation formwork can be removed. Adjacent work, concrete condition and the support arrangement may affect the decision.
After removal, separate soil-contaminated panels from clean material reserved for visible concrete. Remove adhering material with a method compatible with the facing, then examine edges, holes and local damage before assigning the next use.
Record actual recoverable parts. A long side assembled from repeated sheets may yield reusable full panels, while a densely slotted stop end may not. This difference helps build a more realistic next-stage requirement than counting every removed square metre as available stock.
Keep a part reference for each delivery stage
Choose a representative corner, stepped side or stop end for the sample review. Mark its part ID, drawing revision, concrete-contact face and handedness, then check the panel dimensions, openings and edge treatment in the agreed supplied condition. Our cut-list guidance and shuttering plywood sample plan help define the detail to review. Use our sample and order guidance to keep any remaining site machining separate from the supplied reference.
Carry that accepted reference into the order specification by part ID and pour area. Separate newly required pieces from recovered parts the project has accepted for reuse, and identify replacement or spare pieces in the schedule. Agree pack marks and delivery stages that match the sequence, keeping the selected panel construction, applicable product reports and receiving checks with the same order line. Record which parts arrived and their condition before allocating them to the next stage.
Build a foundation plywood order from your drawings
Start with a foundation sketch or plan extract and the sheets or parts you need. We can help organise the supply choices; use the current coordinated drawings and formwork panel requirements to finalise dimensions and part quantities.
Add your destination and delivery stages when known. Our film faced plywood and custom-size options can be quoted as full sheets, blanks or identified parts with the selected finish and processing.
For overall order quantities, use our formwork plywood quantity guide after the formed faces and part sizes have been established.
Plywood supply questions
Can I enquire before the complete foundation cut list is ready?
Yes. Start with the formed faces or a plan extract and the approximate supply need. Final part dimensions and quantities can follow the coordinated formwork drawings.
