PLYWOOD & MDF · CHINA

ROOF SHEATHING PLYWOOD · FACTORY SUPPLY

Roof Sheathing Plywood

Roof deck panels and cut parts, planned around your project.

Source plywood roof deck panels from our own factory in Jiangsu, China. Choose full sheets or scheduled cut parts, with the grade, core, thickness and edges matched to your roof drawing and the roofing surface your team needs.

Start with a roof sketch, current drawing or the dimensions you have. We help develop the panel schedule, sample and product-record requirements, packing and export delivery for your project team to review.

Available to order · 10–15 day production · container shipping.

ROOF PANELS · BOUNDARY PARTS · LABELLED PACKS

Get the panels your roof team needs, ready for the next step.

Bring the drawing or roof schedule you have. We’ll help define the plywood construction, supplied sizes, edge work and product records, then plan the packs around your installation sequence.

Panel format and thickness

Our technical sheet lists 1200 × 2400mm, 1220 × 2440mm and 1250 × 2500mm formats, with thickness options from 7 to 28mm. Select the thickness with your roof design, or send a cut list for finished parts.

Core, surface and edges

Choose the pine/larch or eucalyptus construction, face grade and square or tongue-and-groove profile with the project requirement. Show the surface and edge condition needed by the next roofing layer.

Supply by roof area

Order full sheets, boundary strips or drawn parts with direction and roof references on the schedule. Keep spare and sample quantities separate, then label packs for receiving and site use.

Available to order · production in 10–15 days · container shipping. Freight and delivery terms follow the order and destination.

TECHNICAL DATA · TDS-PS-17 · Rev 2.0 (Oct 2026)

Roof Sheathing Plywood technical data

Roof sheathing plywood with pine or eucalyptus core, exterior phenolic bonding and square or tongue-and-groove edges. Compare the selected strength grade, thickness and sheet format with your project layout; the shipping table uses a 660 kg/m³ eucalyptus construction.

Open the complete technical data, properties and loading tables
Declared values from our technical data sheet TDS-PS-17, Rev 2.0 (Oct 2026). The values for your order are confirmed in the quotation.
Service Class / Exposure DutyService Class 2 & 3 Structural Load-Bearing Duty
Face / Back Veneer SpeciesStress-Graded Eucalyptus, Radiata Pine, Larch, or Birch (1.2–2.4 mm)
Surface Appearance GradeC/D (CDX Structural), C+/C (Sanded Face), or B/C (AS/NZS 2269 Grade)
Core Veneer Species100% Eucalyptus Hardwood (F14/F17 High-Strength) or 100% Coniferous Pine/Larch (F8/F11)
Edge Profile OptionsSquare Edge (SE) or Structural Tongue & Groove (T&G long edges for subflooring)
Adhesive SystemPhenolic Formaldehyde (WBP / EN 314-2 Class 3 / AS/NZS 2754.1 Type A Bond)
Standard Sheet Sizes1200 × 2400 mm (AU/NZ), 1220 × 2440 mm (UK/US), 1250 × 2500 mm (EU)
Length & Width Tolerance±1.0 mm (EN 315 / AS/NZS 2269)
Thickness Tolerance≤ 12 mm: ±0.3 mm | 15–28 mm: ±0.4 mm (EN 315)
Squareness≤ 1.0 mm / m (EN 324-2)
Edge Straightness≤ 1.0 mm / m (EN 324-2)
Harmonized System (HS) Code4412.33 / 4412.39
Reference StandardsEN 13986 (CE System 2+ / 4), EN 636-2 S / EN 636-3 S, EN 314-2 Class 3, AS/NZS 2269 (F11 / F14 / F17), PS 2
Physical and mechanical properties (declared values)
Density (Pine Structural / Eucalyptus Structural), kg/m³550–600 (Pine) / 650–720 (Eucalyptus)
Test method: EN 323
Moisture Content at Dispatch, %8.0 – 13.0
Test method: EN 322
Characteristic Bending Strength (fm,0 — Parallel), MPa≥ 42.0 (Pine) / ≥ 60.0 (Eucalyptus F17)
Test method: EN 310 / EN 789
Characteristic Bending Strength (fm,90 — Perp.), MPa≥ 28.0 (Pine) / ≥ 40.0 (Eucalyptus F17)
Test method: EN 310 / EN 789
Mean Modulus of Elasticity (Em,0 — Parallel), MPa≥ 10,500 (F11) / ≥ 12,000 (F14) / ≥ 14,000 (F17)
Test method: EN 310 / AS/NZS 2269
Mean Modulus of Elasticity (Em,90 — Perp.), MPa≥ 5,200 (F11) / ≥ 6,500 (F14/F17)
Test method: EN 310
Panel Shear Strength (fv), MPa≥ 4.5
Test method: EN 789
Bonding Quality (Type A / Class 3 Boil Test), MPa≥ 1.0 MPa / Bond Quality ≥ 6 (72h Boil)
Test method: EN 314-2 / AS/NZS 2098.2
Formaldehyde grade optionsE0 / E1; select the emission requirement with the order
Formaldehyde — chamber methodEN 717-1; chamber results are expressed in mg/m³
Formaldehyde — desiccator method, mg/L≤ 0.5 (Super E0 option with PF resin)
Test method: AS/NZS 4266.16

Weight and loading basis: nominal 1220 × 2440mm sheets at 660 kg/m³ for an eucalyptus-core configuration, before export packaging. Approximate 40HQ quantities use a 26.8-tonne panel allowance and rounded sheet weights. Pine-core, other sheet formats and the final pack arrangement have their own shipment weights and quantities.

Eucalyptus-core thickness, weight and estimated 40HQ loading · 660 kg/m³
Nominal Thickness Ply Count Area Weight Sheet Weight (1220 × 2440mm) Est. Load / 40HQ
7 mm7 plies4.62 kg/m²13.8 kg~1,942 pcs
9 mm7 plies5.94 kg/m²17.7 kg~1,514 pcs
12 mm9 plies7.92 kg/m²23.6 kg~1,135 pcs
15 mm11 plies9.90 kg/m²29.5 kg~908 pcs
17 mm13 plies11.22 kg/m²33.4 kg~802 pcs
18 mm13 plies11.88 kg/m²35.4 kg~757 pcs
19 mm13 plies12.54 kg/m²37.3 kg~718 pcs
21 mm15 plies13.86 kg/m²41.3 kg~648 pcs
25 mm17 plies16.50 kg/m²49.1 kg~545 pcs
28 mm19 plies18.48 kg/m²55.0 kg~487 pcs

Order options for Roof Sheathing Plywood

Sizes, finishes & supply requirements

MAKE THE ROOF DRAWING QUOTABLE

Use the specification below to organise the panel, supports and roofing interfaces around the project’s requirements. Share the information you have; we help identify the open supply fields and match the proposed product to the grade and evidence your project team needs.

Information to include in a roof sheathing plywood enquiry
RequirementWhat to send
Project & panel roleDestination, roof location and geometry, structural deck or other layer, drawing revision and project acceptance route.
Grade & product identityRequired standard/edition, grade or rating, manufacturer/product reference, actual marking and applicable roof-use evidence.
Thickness & dimensionsSpecified thickness/category, actual sheet or part size, effective covering dimensions where relevant, tolerances, edge profile and measurement stage.
Supports & directionFraming material, support positions and widths, clear spans or centre spacing, panel direction and required edge support.
Loads & design basisProject-defined gravity, snow, construction or concentrated loads and limits; net wind pressure and roof zones where required, and any diaphragm role.
Joints, edges & openingsPanel layout, joint locations and movement provisions, perimeter details, cut-outs, penetrations and supporting details.
Fixings & interfacesDeck-to-frame connections, roof-system attachment requirements, fastener specification and drawing-defined schedules.
Roof system & exposureRoofing and adjoining layers, substrate requirements, construction wetting, service moisture and moisture-control design.
Performance documentsApplicable product properties, rating conditions, declarations, treatment or fire requirements and assembly evidence.
Sample & inspectionPurpose of the sample, product identification, dimension/edge checks, detail-fit review and pre-cover inspection requirements.
Quantity & deliveryQuantities by configuration, installation sequence, destination, pack labels, handling/storage constraints and timing.

GIVE THE PLYWOOD ITS OWN JOB

Plan the plywood deck beneath your roof system.

Plywood sheathing can form the structural deck beneath a specified roof system. Identify that role on the roof section and keep lining, insulation, cover boards and waterproofing as their own components, so the quotation covers the plywood the design calls for.

Coordinate three references

Roof system, plywood deck and supporting structure as linked procurement referencesR · roof systemP · plywood deckF · supporting structure
R / P / F · linked specification references, not a prescribed roof build-up or approved assembly.

Name the support dimension

Two supports identifying centre spacing C and clear distance L separatelyCL
C · support centre spacing. L · clear distance between support faces. Neither is a stated allowable span.

Keep the roof-system, deck and supporting-structure references together on the drawing, with the actual panel direction, thickness, support dimensions and fixing details.

Show whether the deck spans framing or has continuous support, together with the surrounding roof layers and roofing supplier’s substrate requirements. We use those references to keep the proposed supply linked to the designed assembly.

Define where each attachment finishes.

The deck-to-frame connection, roofing attachment and any in-plane diaphragm connection are separate details. Record whether the roofing fastener or bonded interface relies on the plywood, continues into framing or belongs to another assessed substrate arrangement. Keep that roof-system requirement beside the actual panel construction and supplied surface.

Identify the supplied surface, treatment and profile alongside the roof-system preparation and attachment requirements. Keeping site work and the next layer clear in the quotation helps purchasing and the roofing team coordinate the handover; the complete assembly remains subject to its applicable design and evidence.

For a visible underside, include the ceiling appearance and intended finish alongside the structural grade and required evidence. This lets the offer address the roof role and the surface seen from the room.

READ THE ACTUAL PANEL REQUIREMENT

Match the offered panel to the project’s required grade.

Include the complete product designation, standard and edition, thickness or performance category, applicable rating and exposure classification. Identify the actual producer and product that the documents and marking cover.

Descriptions to resolve before accepting an offer
DescriptionWhat to establish
CDX or a veneer face codeThe actual panel grade, bonding/exposure classification, rating and product evidence; the shorthand is not a complete roof specification.
Rated sheathingThe actual product, rating system and conditions of use, including the requirements relevant to the roof layout.
Structural plywoodThe specified grade and directional data for the proposed construction, plus roof-specific supports, connections and assembly requirements.
OSB alternativeA separately identified material and accepted rating, dimensions, edges, exposure and installation requirements; not a plywood veneer construction.
Bare plywood corner showing natural veneer grain, a sound knot and two square-cut layered edges
Natural veneer face and square-cut plywood edges.

Specify the surface handed over to the roofing team.

Describe the face, reverse and edge condition the roofing team will receive. Agree permitted features and preparation alongside the actual product reference, moisture acceptance and roof-system attachment requirements, so the supply and handover checks use the same basis.

APA’s plywood selection guidance separates grades, bond classifications and span ratings. Keep the selected panel rating, thickness and its conditions with the roof layout. Where the rating uses support centre spacing, record that datum alongside the actual clear span and edge support for the project review.

For a European specification, identify the structural designation and relevant documents under the applicable framework. EN 636 includes both structural and non-structural applications. Record the destination’s complete product designation and applicable documents when comparing an alternative panel.

Keep three specification fields separate.

Thickness or Performance Category describes one part of product identification; a panel grade or rating has its own applicable conditions; the installed roof uses a particular support, direction, edge and connection arrangement. Compare the offered product against all three. Review the selected panel together with its joint, attachment and roof-system requirements so the quotation covers the complete deck brief.

Keep the producer, product marking, panel configuration, standard and edition together with the covered rating. Where treatment is required, include its applicable structural, fastening and service data in the same review.

If considering plywood or OSB alternatives, compare each actual product with the installed requirement and the roofing system’s substrate acceptance. Keep supporting data and any proposed differences visible for the project’s substitution review.

KEEP LOADS AND CONNECTIONS TOGETHER

Carry the roof layout into the panel schedule.

Turn the current roof drawing into order lines with panel direction, supports, joints and connections. Keep applicable bending and deflection data alongside the separate connection and assembly requirements, so purchasing can compare the proposed product on the design’s basis.

Across the supports

Use the actual panel direction, support dimensions, load case and service limits from the roof design. Include concentrated loads where required and confirm the applicable strength direction from the proposed product’s data.

Review the directional data brief

At joints and openings

Show edge support, joints, perimeter strips and penetrations. Include specified blocking, clips or edge profiles where required by the design. A joint gap, tongue-and-groove fit and structural edge support serve different purposes.

Review supports and panel joints

Through the connections

Keep deck-to-frame fixings, roof-system attachments and any diaphragm connections distinct. Wind uplift and in-plane load transfer are different checks. Record the project’s fixing schedules and changes at roof zones rather than adopting one pattern everywhere.

Plan the assembly document review

APA’s roof guidance treats deck spans, fastening, diaphragms and wind-rated assemblies as linked design subjects. Keep the selected panel, framing, fasteners and roof-system references together for the project’s span, uplift and diaphragm review.

Mark the roof zones on the schedule.

Keep the project's field, edge, corner, ridge and opening details identifiable where they have different requirements. Use the zone definitions and fixing schedules from the project roof design. Match panel order lines and installation records to those references so an alternative or cut piece does not lose its intended position.

List outside panel dimensions, effective cover and the finished boundary parts separately. Preserve required panel direction, edge details and supports when reviewing the cutting layout; any narrow-strip detail still needs acceptance within the roof design.

Show service openings and cut panels on the revised layout before processing. Carry narrow pieces, edge support and fastening changes through the responsible designer’s review, then use the accepted layout for machining, labels and the installation record.

FROM ROOF GEOMETRY TO ORDER LINES

Turn the roof drawing into a clear panel and part count.

Use the developed roof surface and actual panel layout to build your order. Separate full panels, boundary pieces, opening details and additional material by purpose, so the quotation follows the work your roofing team will receive.

Two separate rectangular plywood boards and one narrow strip with natural wood faces and layered cut edges
Rectangular plywood panels and a narrow cut strip with natural veneer faces.

Make each full panel and boundary part an order line.

Schedule full panels, strips and drawn pieces by finished size, configuration and roof reference. Carry direction and edge details into machining and pack labels, and separate installed, spare and approval material. Keep each finished part linked to the current roof drawing and the accepted panel layout.

Start with the surface that the panels cover.

Record the developed dimensions of each roof plane, including the drawn eaves, overhangs, hips, valleys and openings. Keep horizontal plan area and sloped roof area in their own fields. Check the panels around an opening on the layout, including their supports and cut edges, before changing the order count.

Count the accepted panels and parts.

Use the selected panel’s outside dimensions and effective covering width with the actual direction, joints, support positions and edge profile. We can quote full-sheet supply or the cut parts from that schedule, with machining and labels included in the agreed scope.

Roof quantity fields to include in the quotation
Schedule itemInformation to retain
Roof planesDeveloped dimensions, drawing revision and the roof area or zone reference.
Full panelsSelected product, thickness, direction, edge profile, effective cover and count from the accepted layout.
Boundary and opening partsFinished sizes, profiles, cut-outs, support details and quantity by part reference.
Spare and sample materialPurpose, selected configuration and quantity listed separately from installed panels.
Dispatch packsRoof or sequence reference, part identities, counts and protected pack arrangement.

Review cutting allowances, usable offcuts and additional panels with the actual layout. List the agreed extra material rather than applying one percentage to every roof. For repeat roof sections, keep the part schedule and drawing revision with each pack so the site team can identify the intended location.

PLAN THE CONDITION BEFORE COVERING

Plan the roof deck handover before the next layer goes on.

Plan protection through transport, storage and installation as well as the completed roof’s service exposure. Match the selected panel and bond to those conditions; construction-stage moisture acceptance and permanent weather exposure require their own applicable assessment.

Keep drainage, waterproofing and condensation control with the roof-system design. Include the roofing, insulation and adjoining layers, plus the specified ventilation or vapour-control requirements, when discussing the panel and surface handed over to the roofing team.

Agree the substrate condition required before the next layer is installed: dimensions and surface condition, relevant moisture checks, damaged edges, bond separation or distortion, and the roofing system’s preparation requirements. Assess affected material with the supplier and project team before it is concealed.

Open the roof deck handover and moisture checks

Agree what must be checked at the handover.

Record the measuring method, instrument, points and conditions for any moisture criterion required by the actual product or roof-system instructions. Record surface preparation, panel condition and moisture findings against the selected product and roof-system instructions. Use the measuring method and acceptance criteria specified for that handover.

Identify who assesses affected panels and who releases the substrate for covering. Retain the panel or pack identity, location, weather history, findings and agreed action. Identify cut edges, joints, openings and attachments by roof location, with the inspection finding and agreed action retained on the pre-cover record.

Record weather exposure and inspection timing. Keep any drying assessment, affected panel locations and agreed actions with the inspection record. Follow the selected product and roof-system instructions for storage, handling and installation.

GIVE THE SAMPLE A CLEAR PURPOSE

Use a sample to check the proposed panel and roof detail.

Share the detail you want to review and we help plan a representative sample with the proposed product identity. Compare dimensions, edge profile, visible appearance where relevant and specified interface fit with the current drawing and matching product information.

Use the same panel reference for purchasing, design and the roofing team. A current drawing or photograph helps us identify the joint, edge or adjoining surface you want to review.

  1. 01

    Record the product

    Manufacturer, code, grade, thickness, construction and the marking the sample represents.

  2. 02

    Review the detail

    Dimensions, specified edge profile, joints and adjoining components on the current drawing.

  3. 03

    Check the document match

    Confirm the product and installation conditions covered by the evidence the project requires.

  4. 04

    Retain the approval

    Keep the accepted reference, inspection scope and drawing revision with the order.

Use the sample to review the dimensions, profile, surface and fit of the agreed detail. Keep structural, uplift, diaphragm or fire requirements with the applicable product and roof-assembly documents. If further assessment is needed, agree the configuration, method and project reviewer alongside the sample plan.

MATCH THE EVIDENCE TO THE ROOF

Review product records alongside the panel offer.

List the product and assembly documents required for the destination and roof design. Review the issuer, product reference, grade, construction, thickness, applicable rating conditions and installation scope. Keep any separate roofing-system approval with its covered substrate and attachments.

Connect the selected structural panel’s grade, construction, thickness and marking with the required product records. Keep the roof-system approval, substrate requirements and attachment details alongside that panel reference, so the project team can review the offered deck in its intended assembly.

If fire-retardant or preservative treatment is required, identify it as part of the configuration and check the applicable structural and service data. Add sourcing, emission and other project documents to the same order pack, with each record’s configuration and intended-use scope identified.

Review the product document brief

Link the offer to five references

  • Roof schedule, location, design requirement and drawing revision.
  • Actual producer, product code, grade, construction and thickness.
  • Product marking, properties, rating conditions and required declarations.
  • Applicable roof assembly, connections and approval scope.
  • Accepted sample, inspection record, order and delivery batch.
Discuss the required documents
Records to connect with the roof sheathing order
RecordProduct and project scope
Technical dataTDS-PS-17, core, selected grade, thickness, panel directions, dimensions and property basis.
Roof product and system recordsApplicable grade or rating, marking, intended-use conditions, roof-system substrate and attachment references.
Sample and cut-part scheduleAccepted edge or interface detail, part dimensions, required direction and drawing revision.
Inspection and pre-cover checksBatch or pack identity, condition, roof location, required measurements and agreed handover actions.
Packing and dispatchQuantities by configuration, roof-area or installation-sequence labels, protection and delivery records.

KEEP THE DECK IDENTIFIABLE ON SITE

Receive roof panels in the order your project needs them.

Discuss the installation sequence, roof zones and unloading needs with us when planning the order. We agree panel and pack identification, quantities and receiving checks so full sheets and cut parts remain connected to the accepted configuration.

Plan delivery and protected storage around the installation sequence. Supported packs and clear labels help receiving and site teams retain the roof references. Record transport or site damage, then keep layout, connections, openings and the required inspection findings with the pre-cover check.

For a proposed change in product, grade, construction, thickness, treatment, profile or fixings, keep the revised supply and applicable documents together for technical acceptance before installation.

Plan production, container delivery and support.

Available to order. Production takes 10–15 days, with timing recorded in the order confirmation. Panels ship by container; packing, freight and delivery terms follow your order and destination. Allow sea transit separately from production when scheduling roof work.

Supply includes a 180-day warranty. Contact our team with the order, panel or pack reference, photographs and issue details. We’ll agree the return or replacement solution and related freight for the order, keeping the selected configuration and roof references with replacement parts.

ROOF SHEATHING BUYING QUESTIONS

Resolve the deck requirement before comparing prices.

What plywood should we use for roof sheathing?

Choose the panel specified or accepted for your roof design and destination. Our supply options include pine/larch or eucalyptus construction, selected faces and edge profiles. Send the required grade, thickness, supports and roofing brief, and we’ll help organise the panel and product records for the order.

What thickness is needed for a roof deck?

Our technical sheet lists thickness options from 7 to 28mm. The project designer selects the thickness using the actual panel grade, support layout, loads, edge support, direction and roofing requirements. Send that schedule or the current drawing so we can quote the selected panel and processing.

Is CDX the same as roof-rated plywood?

If your drawing calls for CDX, send that requirement with the actual panel grade, rating, marking and exposure classification. We’ll connect those fields with the proposed construction and roof detail, so the quotation identifies the panel and conditions required by your project.

Can we replace plywood roof sheathing with OSB?

Compare the proposed OSB product’s grade, rating, dimensions, edges and exposure conditions with the roof design and roofing-system substrate requirements. Have the project team accept the substitution before ordering, then retain the selected material and installation details on the revised schedule.

Do all roof panels need clips or tongue-and-groove edges?

Choose the edge and joint arrangement specified for the selected panel and roof design. Show blocking, clips, square or tongue-and-groove profiles and joint movement details on the drawing. We’ll quote the required panel edge and processing against that accepted layout.

Does a span rating establish wind-uplift resistance?

A span rating is one panel-selection field; wind-uplift performance depends on the specified roof assembly and connections. Keep deck-to-frame fixings, roofing attachments and any diaphragm requirements with their project references when requesting the panel and documents.

Can wet roof sheathing be covered once the rain stops?

Arrange the pre-cover inspection required by the selected panel and roof system. Record wetting, surface condition, damage, distortion and the specified moisture checks, then retain the agreed release or remedial action by roof location before the next layer is installed.

Does PanelSource manufacture plywood?

Yes. We manufacture plywood in our own factory in Jiangsu, China. For roof sheathing, define the actual proposed product, required grade and roof-system conditions with the project schedule, retaining the applicable product documents and marking for that configuration.

Can we order from the roof plan area alone?

Start with the developed roof-slope dimensions and actual panel layout. Include joints, profiles, direction, supports and openings when counting full sheets and parts, then list spare and sample material separately. Send the drawing or current schedule and we’ll help organise those quantities for the quotation.

Is effective cover the same as the outside sheet size?

Use the finished profile, joints and field dimensions from the accepted roof layout to define effective cover. Keep that covering dimension alongside the outside panel size in the schedule, so cutting, quantities and receiving checks use the same basis.

Which extra material belongs in the quotation?

List spare panels, boundary parts and approval material by purpose and configuration. Keep them separate from installed quantities and net roof area, with any cut-direction and roof-zone requirements. Agree the actual allowance with the layout rather than applying one percentage to every roof.

What should we send for a roof sheathing enquiry?

The roof drawing, panel schedule, destination, required grade/rating and approval checklist. Add supports, connections, roof-system information, quantities, timing and unresolved fields. We can review the material brief, sample purpose and quotation scope with you.

Which panel formats and cut parts can we order?

Our technical sheet lists 1200 × 2400mm, 1220 × 2440mm and 1250 × 2500mm formats, with square or tongue-and-groove profiles selected for the project. Send other dimensions, boundary strips or drawn parts with the grade, thickness, direction and required edge detail for quotation.

How long does production take and how are panels delivered?

Production takes 10–15 days according to the confirmed order. Panels ship by container, with freight and delivery terms agreed for your destination. Supply includes a 180-day warranty; returns or replacements and related freight are arranged for the order and issue.

FROM ROOF DRAWING TO A COMPLETE OFFER

Let’s turn your roof schedule into a clear panel order.

Send a roof sketch, current drawing or the dimensions you know. Add the destination and required grade or roof-system brief when available. We help complete the proposed panel, sample, product-record and delivery scope, with open technical requirements clear for your project team.

Send us your panel requirements.

Tell us your panel, dimensions, quantity and destination port.

Request a quote ↗